Chemical Plant - Hybrid DCS and Safety System
Scope: Grassroots construction of a new chemical plant adjacent to an existing refinery, and including a new hybrid control system for the batch and process control. Mangan brought in to remediate off-schedule and technically incomplete installation.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery Coker Reactor SSD
Scope: Install new reactor pressure safety interlock system including new field instrumentation and local control room operator interface.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Paper Plant Boiler Safety System
Scope: Replace electro-mechanical based boiler shutdowns with new triple redundant safety system.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Biotech Building Management System Upgrade
Scope: Install new Building Management System for an existing lab and process design facility in a biotech plant.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery SRU Safety System
Scope: Replace existing Sulfur Plant controls with a new DCS and Safety System for a Sulfur Plant.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery Boiler Feedwater System Off-sites
Scope: Installation of new MF/RO off plot systems for Boiler Feedwater to an existing refinery distribution system.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinerywide Shipping & Transfer System SCADA
Scope: Install refinerywide SCADA for remote control of shipping and booster pumps, motor operated valve manifolds and tank gauging systems.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
[back to top]
|
 |
|
| |
| |
| |
 |
Refinery SRU Plant DCS & Instrument Modernization
Scope: Replace obsolete control equipment, add new DCS extension from the plant-wide system, and add a new safety system for an existing Sulfur Plant.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery Electrical Energy Management System
Scope: Install refinerywide energy management system to: shed loads in the event of a utility trip; monitor and reduce circulating currents; and monitor load centers.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery SRU 02 Enrichment Control System
Scope: Install a temporary PLC/HMI based control system, w/ eventual cutover to new DCS, for an SRU O2 Enrichment process plant addition.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Biotech Building Fermenter Control Replacement
Scope: Replace existing process fermentors with a new biotech product fermentor control system to acquire FDA cGMP process validation.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Biotech Process Chromotgraphy Modules
Scope: Installation of new chromotography skids with advanced automation capabilities in an existing biotech manufacturing facility.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery Fractionation Unit DCS & Instrument Moderniation
Scope: Reinstrumentation of a process unit, including replacement of existing control systems hot, and the rebuild of an old control room without interrupting plant operation.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Golf Ball Plant Automation
Scope: Installation of a new golf ball production line, start to end, with high level automation for all production processes.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
[back to top]
|
 |
|
|
|
|
| |
| |
Refinery DCS Consolidation
Scope: Relocate and replace 4 local control rooms into a new central control room for 1/2 of the refinery units.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery FCC Power Recover Train Instrument Modernization
Scope: Replace obsolete power recovery train control system with new local PLCs, machinery protection systems and TMR shutdown systems.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery FCCU Safety System
Scope: Replace obsolete control equipment, add safety instrumentation and triple redundant safety shutdown system for a refinery cat cracker.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Biotech Manufacturing Building Control System Replacement
Scope Replace existing utility control systems for major biotech manufacturing facility, without interrupting production or validation.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Pipeline SCADA
Scope: Installation of new oil pipeline from several Bakersfield origins, through downtown LA, to So Cal refineries, including new SCADA w/ world class leak detection system.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery & Pipeline Shutdowns
Scope: Install SCADA to SCADA interface to facilitate the remote shutdown of refinery shipping pumps by separate pipeline operations.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Pipeline Energy Management System
Scope: Install energy management database (MS Access) to measure and compare pipeline energy utilization, scheduling and contract purchase options.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
[back to top] |
|
|
|
 |
|
 |
Refinerywide Continuous Emissions Monitoring Systems
Scope: For SCAQMD RECLAIM compliance, install 34 new CEMS and a refinerywide DAS.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinerywide Continuous Emissions Monitoring Systems
Scope: For SCAQMD RECLAIM compliance, install 22 new and modify 10 existing CEMS and a refinerywide DAS.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinerywide Continuous Emissions Monitoring Systems
Scope: For SCAQMD RECLAIM compliance, install 15 new and modify 8 existing CEMS and a refinerywide DAS.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinerywide Continuous Emissions Monitoring Systems
Scope: For SCAQMD RECLAIM compliance, install 14 new and modify 7 existing CEMS and a refinerywide DAS.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinerywide Continuous Emissions Monitoring Systems
Scope: For SCAQMD RECLAIM compliance, install 12 new and modify 4 existing CEMS and a refinerywide DAS.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery Unit Safety System Upgrades
Scope: Replace obsolete control equipment and add a redundant safety instrumented system for a gas oil hydrotreater.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Ammonia Plant DCS Upgrade
Scope: De-mothball idled ammonia plant, and replace all obsolete instruments and controls with new hybrid based control and safety systems.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Lube Plant Electric Distribution System Modernization
Scope: Replace obsolete medium voltage power distribution and control system in a minimal outage period, and re-using existing switchgear houses.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Geothermal Power Plant
Scope: Install new geothermal plant on an idled volcano in Indonesia, including new central control room and all required plant instrumentation.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinerywide Furnace Safety System Upgrades
Scope: Replace 15 electro-mechanical based furnace shutdowns with triple redundant PLC based safety instrument systems.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery Clean Fuels Upgrades
Scope: : Addition of (3) new process units and modifications to all existing units, with associated and selective upgrade to the plant control systems.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinery Fire Repair
Scope: Fire Rebuild for a damaged Coker plant, consisting of the replacement of all homerun control system wiring in a 17 day critical path window.
|
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |
Refinerywide Unit Safety System Upgrades
Scope: As a part of an Instrument Modernization Project, development of refinery SIS standards, followed by the installation of 3 new triple redundant refinery safety shutdown systems for a hydrocracker, hydrotreater and hydrogen process units.
| |
|
|
|
|
|
|
|
|
|
|
|
| FEL |
PM |
E |
I |
P |
CM |
C |
Tr |
Te |
C/V |
S |
M |